Thursday, August 25, 2011

Taking So Long . . .

. . .but I’ll continue to be patient as we all are.

David has a plan and we’ll trust him to put his plan in place and get us into the RV in some sense before this year is through.

He bought a lot of stuff to remodel and repair the RV with so I guess that’s a good sign.  She does need some work but not all that much and it’s not all that bad considering she’s 23 years old.  Now she is in a little worse shape as David has started to remodel the rear living area that was I guess the sofa-bed and sort of the living room of the RV.  This is becoming a bedroom and storage area with the storage underneath the bed.  It’ll look good when it’s done and I guess my part of this will be the painting and wallpapering of the walls and bedframe.

Eugene will do his best to help where he can but much of the work does not really require two people and the RV is so small now that there are so many supplies in there that there’s hardly enough room for one person to move around in so two people would be tough to accommodate.  But that’s all right with us as David is more than capable of handling this part of the project on his own.

We are in a kind of dilemma about what to do with the floor as we want to replace it with something fresh but not sure with what.  we’ve seen a few flooring samples we like but do not feel like they quite fit with our design and decor elements.  We’ve thought about painting the floor but are not sure how that’ll stand up over the long-term.  But we need to decide on something the time to replace the floor is now as David has a few areas of the RV dismantled.

We’ll figure something out and we’ll just continue along as we have been for the past couple of years and hope for the best.

Talk to you all later, thanks for stopping by. . .Edith.

No comments:

Post a Comment